cabecera

Industrial Tours

Company visits WCCE

Installation: Sant Joan Despí Treatment for drinking water station (ETAP)
Address: C-245, s/n, CTRA Sant Boi, 08940 Sant Joan Despí, Barcelona
Capacity: 30 people
Schedule: from 10 am to 12 pm
Description: The ETAP of Sant Joan Despí, operating since 1955, operates with captured surface waters of the Llobregat River and groundwater from the aquifer of the lower Valley of the river, to produce drinking water.
It is one of the most advanced European technologies, in addition to the pretreatment, clarification and final disinfection processes, it applies a treatment with ozone and activated carbon which ensures its better quality. In addition, this plant applies innovative processes, such as reverse osmosis and the reuse of waste.
Meeting point FIRA: 09:15AM


Installation: Sant Feliu de Llobregat Wastewater treatment plant
Address: Riera de la Salut, n. 08980 - Sant Feliu de Llobregat
Capacity: 40 people
Schedule: from 10 to 11:30 h
Description: The sewage treatment plant of Sant Feliu de Llobregat is a facility dedicated to the treatment of wastewater of part of the metropolitan area of Barcelona. It has ability to treat about 70 million liters of wastewater every day. It contains typical equipment and processes of a WWTP: pre-treatment, primary treatment, biological secondary treatment. It also has a line of treatment of sludge, which includes biogas obtaining and energy generation.
Meeting Point FIRA: 09:15AM


Company: BASF SONATRACH PropanChem S.A
Address: Carretera N-340, km. 1156. 43006 TARRAGONA
Capacity: 40 people
Schedule: from 10 am to 12:30 h
Other: It would require information on the identification of visitors: number of passport or ID and nationality
Description: BASF SONATRACH PropanChem S.A., a joint venture between the German BASF and the Algerian SONATRACH  for the production of propylene. The installation has a production capacity of 350,000 tons per year of propylene. Propane necessary for the production of propylene is imported from Algeria. The propylene production process includes the transportation of propane from the port of Tarragona, the dehydrogenation reaction and separation of propene and propane by distillation.
Meeting Point FIRA: 08:30AM


Installation: Sant Adrià del Besòs total waste management plant
Address: Carrer de la Pau 3-5, 08930 Sant Adrià de Besòs
Capacity: 35 people
Schedule: from 10 to 11:30 h
Other: Closed shoes should be worn
Description: Installation combines the management of solid urban waste and incineration with energy recovery. It takes place the separation of the different components of the waste and the organic part are treated in digesters for biogas production. Treatment capacity: 192,000 tons/year of separation and digestion and 350,000 t/year of energy recovery.
Meeting Point FIRA: 09:00AM


Company: Lyondell-Basell
Address: Carretera N-340, 0 Km 1155, 43480 Vila-seca, Tarragona
Capacity: 40 people
Schedule: from 10:00 to 12:30 h
Other: It would require information on the identification of visitors: number of passport, identity card and nationality
Description: Company that manufactures polypropylene and advanced polyolefins. It has a capacity of 225000 tons per year. The process involves the polymerization of propylene with Ziegler catalysts, as well as the compounding of resins ready for transformation. Advanced polyolefin products are used in automotive components, electrical appliances and pipe and blade applications.
Meeting Point FIRA: 08:30AM


Installation: El Prat de Llobregat Beer production plant
Address: Ronda de Ponent, 41. 08820 – El Prat de Llobregat
Capacity: 40 people
Schedule: from 10am to 12 pm
Description: Do you want to know the secrets of the Mediterranean beer? Come visit the Estrella Damm Brewery and discover the brewing process of our beer, made with 100% natural ingredients and still brewed to the original 1876 recipe by August K. Damm.
You will also be able to enjoy the taste of the Mediterranean with a beer tasting of Estrella and other beers of the family.
The brewing is a meticulous process in which the beer, little by little, is acquiring its definitive characteristics. This process, which lasts approximately four weeks, is basically structured in eight stages. All, except the first, are made in the production plant of Damm in Prat de Llobregat.
Meeting Point FIRA: 09:15AM
logoGPBlanco

Phone: +34 932.388.777
wcce10@wcce10.org

Maria Cubi, 4 - Pral.
08006 Barcelona (SPAIN)

Web page created by
LogoNegro